Answer Hub · Project Management
How can restoration companies give subcontractors access to job information?
The short answer
Give subcontractors their own logins to only the jobs and details they need: address, access instructions, scope for their trade, schedule, relevant photos and a way to message the project manager. Keep pricing, carrier correspondence and other jobs hidden. Require them to post their own photos and notes to the job so their work is documented in your file.
Why subcontractor access is a real problem
Reconstruction after a water or fire loss often depends on subs: drywall hangers, flooring installers, electricians, plumbers, painters, cabinet shops. Each one needs the address, the lockbox code, the scope for their trade, the schedule and a few photos. Today that usually travels by text message, a forwarded email and a phone call from the project manager.
That works until it does not. The sub shows up on the wrong day, works from an outdated scope, or finishes without taking photos. When the adjuster or the homeowner asks questions later, your file is missing the very part of the job you did not do yourself.
Principle: share the minimum, collect the maximum
Subcontractors should see what they need to do their work and nothing more. At the same time, you want them to give back as much documentation as possible.
What subs usually need to see
- Property address, access instructions, contact rules for the homeowner.
- The scope for their trade, written clearly (rooms, quantities, materials, finishes).
- Schedule dates and the work that must be done before they arrive.
- Relevant photos: the area, existing conditions, anything that affects their work.
- The project manager's name and a way to reach them.
What subs usually should not see
- Your pricing to the customer or carrier, and your margins.
- Carrier and adjuster correspondence.
- Other trades' pricing.
- Jobs they are not assigned to.
What subs should give back
- Before, during and after photos of their work.
- Notes on anything unexpected (hidden damage, code issues, material delays).
- Completion confirmation, and a sign-off if your process uses one.
Step-by-step setup
- List your regular subs and their trades. Note who is on the job, who is the contact and how they prefer to work.
- Write a sub scope template for each trade. A one-page format the PM fills in: rooms, quantities, materials, start conditions, finish expectations.
- Give each sub company its own login, ideally one per crew lead rather than a shared password.
- Assign them only to their jobs. Remove access when their work is done.
- Set photo expectations in writing. For example: wide shot of each room before starting, photos of anything concealed before it is covered, wide shot of each room at completion.
- Route questions through job messaging, so the conversation stays with the job instead of in the PM's personal phone.
- Add the expectations to your sub agreement. Your attorney can help you word documentation and confidentiality terms.
A hypothetical reconstruction schedule
Picture a kitchen and family room rebuild after a dishwasher leak, with four subs.
| Day | Sub | What they see | What they post |
|---|---|---|---|
| Mon | Electrician | Scope for outlets moved by new cabinets, access notes | Rough-in photos before walls close |
| Tue–Wed | Drywall | Rooms, square footage, finish level | Hung, taped and finished photos |
| Thu | Painter | Colors, rooms, ceilings yes or no | Completed room photos |
| Fri | Flooring | Material, rooms, transitions | Completed floor photos, leftover material note |
Without shared access, the PM makes roughly a dozen calls and texts that week and still has gaps in the photo record. With it, the PM reviews each sub's posts at the end of the day and follows up only on exceptions.
Common mistakes
- Sharing everything to save time. Sending the full estimate to a sub exposes pricing and invites scope confusion.
- Leaving access open forever. Remove subs from jobs once their work is complete.
- No photo standard. "Take some pictures" produces three blurry shots. Spell it out.
- Scope only in the PM's head. If the scope is verbal, disputes are almost certain. Write it down in the job.
- Letting conversations scatter. Texts on personal phones disappear when a PM leaves the company.
- Forgetting the homeowner. Tell the customer which subs are coming and when, so a stranger at the door is not a surprise.
Handling changes and surprises
Subs find things. The drywall crew opens a wall and finds old wiring; the flooring installer finds the subfloor still soft near the toilet. Decide in advance how those discoveries are reported: a photo and a note posted to the job, followed by a message to the project manager, before any extra work is done. The PM then decides whether a change order, a supplement conversation with the adjuster, or a schedule shift is needed. Subs should never agree to extra work directly with the homeowner. Putting that rule in writing protects the sub, the customer and your company.
A simple Monday checklist
- Pick your three most-used subs.
- Write a one-page scope template for each of their trades.
- Decide what they will see and what they must post.
- Set up their access on one active job as a pilot.
- Review their posts on Friday and adjust.
How RestoreUnited helps
RestoreUnited includes web and mobile apps for subcontractors, along with Work Orders, Photos & Journals and Messenger, so a sub can see their assignment and add documentation to the same job file the office uses. Job Connect handles customer communication separately. The real gains, though, come from deciding what subs see and what they owe you before the first login is created.
See it in RestoreUnited: Job Management
RestoreUnited product videoFrequently asked questions
Should subcontractors see the full estimate?
Usually not. Share a trade-specific scope with rooms, quantities and materials. Keeping your pricing and carrier correspondence private avoids confusion and protects your margins.
How do we get subs to take photos?
Put a specific photo standard in writing and in your sub agreement, give them an easy way to post to the job, and review their posts. Subs who know the PM checks tend to comply.
When should we remove a subcontractor's access?
As soon as their work on the job is complete and any punch items are closed. Leaving access open on finished jobs creates unnecessary exposure.
Do we need legal language about documentation in sub agreements?
It is wise to include documentation and confidentiality expectations. Have your attorney draft or review the wording for your state and your contracts.